Kodak Bldg C-29C

 

A fast-track project, Building 29C was completed in 9 months after the design process began.  Coordination with the equipment manufacturer in Switzerland was critical during the design phase. 

 

Project Type

Manufacturing Facilities

Date

2004

Location

Windsor, Colorado

Contractor

M.A. Mortenson

Owner/ Developer

Kodak

Cost

$4 million

Region

Colorado Front Range - North

Project Delivery Type

Design Build

Services Provided

Integrated Steel Delivery, Structural Engineering

Materials

Steel

Features

12,000 sf addition to existing facility, housing process equipment and several small crane systems.

        