Search

Celebrating 22 Years of Service!

Colorado Front Range - Central / South


US Olympic Museum

 

50,000 sf museum

 

Cadence at Union Station

 

309,000 sf post-tensioned concrete mixed-use apartment complex with 10 stories of residential over 3 stories of parking.  Anticipated LEED Gold

 

20/20

 

353,000 sf post-tensioned concrete apartment complex with 7 stories of residential over 3 stories of parking. LEED Gold BD+C.

 

Coors Field Parking Structure

 

372,000 gross sf 3-story precast parking structure to replace a surface lot

 

Swigert-McAuliffe International School

 

100,000 sf composite steel, masonry, and precast building consisting of a 1 story and 3 story classroom wings a a central core containing the cafeteria and gym - anticipated LEED Silver

 

Metro State Student Success Center

 

145,000 sf 4 story steel framed building featuring a 44 ft cantilever framed with 2 story steel veirendeel trusses.  LEED Gold BD+C

 

TAXI 2

 

The innovative 550-ft long "landscraper" combines 2-story loft living on the upper floors and retail/office on the lower.  The project is located in River North, Denver's newest emerging neighborhood.

 

Kent Denver Dining Hall

 

20,000 sf cafeteria building including re-use and renovation of 5,600 sf of an existing cafeteria - achieved LEED BD+C Platinum.

 

Industry

 

4-story precast parking garage above 2 levels of steel framed office space at levels 1 and 2.

 

Tutt Science Center*

 

60,000 sf three story classroom and lab building at Colorado College.

 

American Academy

 

92,000 sf 3-story elementary school on a steeply sloping site

 

Catalyst

 

164,000 sf, 7-story office building with retail space on the ground level; along side 130,000 sf, 5-story parking garage also with retail space on the ground level

 

Creekside West Residences

 

80,000 sf post-tensioned podium slab over parking with four stories of wood framed residential space for assisted senior living - LEED BD+C Platinum

 

Alexan Uptown

 

12 story residential tower of approximately 540,000 sf, 8 levels of Prescient framing over 5 levels of post tensioned concrete. KL&A was EOR for the Prescient portion of the building.

 

UCCS Academic Office Building*

 

5 story classroom building 60,000 sf structural steel frame. Special services: structural steel shop drawings.

 

Evie Garrett Dennis Campus Building 5

 

45,000 sf building housing middle school, pre-school, nursery and office uses for DPS

 

Cortez Fire Station

 

13,500 sf, 2-story new fire station

 

Residences at Creekside

 

130,000 sf six story senior living housing development.

 

Denver Housing Authority South Lincoln

 

93,000 sf eight story housing development consisting of cast-in-place mild reinforced concrete below grade with post-tensioned concrete flat plate construction above grade - anticipated LEED Gold

 

Peak to Peak

 

Additions to three buildings on an existing school campus. Approximate added areas include 10,000 sf to an elementary/middle school, 7,100 sf to the high school, and an activity building with a gymnasium and cafeteria that added about 25,000 sf.

 

UCD Anschutz Academic Office West*

 

4 story 90,000 sf academic office building - structural steel framed

 

Evergreen Middle School

 

20,000 sf steel framed addition and renovation of existing structure containing a gymnasium, locker room facilities, and classrooms

 

Flight

 

145,000 sf, 4-story office building

 

Denver Housing Authority Block 3B

 

145,300 sf comprised of four 2-6 story wood framed buildings on a concrete podium slab over parking and featuring panelized construction - LEED Gold.

 

Aspen View Academy

 

75,000 sf composite steel and steel joist framed building consisting on 3-story classroom wings and 1 story gymnasium, cafeteria and library areas.  

 

1401 Lawrence

 

Cast in place concrete tower with miscellaneous metals package.

 

UCD Anschutz PASCAL*

 

30,000 sf 2 story library and storage building.

 

Omar D. Blair School

 

79,000 sf 1-story K-8 facility with recreation center and library that is shared with the community

 

Colorado Dept. of Transportation Headquarters

 

175,000 sf, 5-story office building with a 130,140 sf, 3-story parking structure.

 

Trade Deficit (RiNo Shipping Containers)

 

Conventional shipping containers were deconstructed and reassembled to create a striking monument in the River North District of Denver.  The choice of materials reflects the manufacturing and shipping history of the RiNo area.

 

Campus Village

 

250,400 sf four story wood framed student housing project for the Auraria campus which encompass University of Colorado at Denver, Metropolitan State College and Community College of Denver

 

Source

 

A renovation included significant interior modifications for a tenant build out to accommodate an "open-air market" concept.  The renovation efforts included strengthening the existing structure and providing new mezzanine levels for future occupants.  Tenant spaces were delineated with exposed cold form stud framing and the front facade was modified to accommodate large, glazed, operable doors.    

 

CCU First Residential

 

Light gage dormitory using Prescient systems.

 

Adams State ESSB*

 

45,000 sf renovation and 6,000 sf addition.

 

Westerly Creek at Stapleton

 

76,000 sf 2-story composite steel and masonry building consisting of 2 classroom wings and a central core containing the cafeteria, library and gym

 

CoorsTek AMP

 

The project is two 4-story pop-up structures and associated equipment platforms within an existing building that will be used for advanced material processing

 

Asbury Park

 

330,000 sf four story student housing project over two stories of underground parking

 

Manufacturing Facilities

 

625,000 sf of manufacturing space in five buildings with heavy overhead crane systems, numerous below grade structures and heavy design loads

 

Drive

 

40,000 sf, 4-story office building in the Taxi mixed-use development.  

 

The Colorado Health Foundation

 

3-story, office building with an underground parking Garage.

 

Western Ridge Housing at Colorado College*

 

50,000 sf 4 story 3 building dorm complex.

 

Compass Montessori

 

15,000 sf timber structure and a 10,000 sf more traditional high school structure

 

Wildflower Ranch

 

7,000 sf residence featuring sustainable design, architectural concrete and exposed heavy timbers located in a high wind region.

 

Denver School of Science and Technology

 

45,000 sf middle school addition to an existing high school - LEED Silver.

 

Raccoon Creek Barn

 

Addition and renovation of an existing wood barn. In the existing barn area, the attic floor framing was removed and column lines moved to create a more open space for public events.

 

Gauge

 

5-story steel framed office building with a four level interior post-tensioned concrete parking garage.

 

Pueblo Community College Fremont County Campus*

 

28,000 sf classroom building with 2 stories.

 

Broadway and Acoma Lofts

 

2 buildings with a total of 110 residential units and 11,000 sf of ground floor retail space and surface parking.

 

Colorado Coalition for the Homeless Renaissance Riverfront

 

100,000 sf four story wood framed low-income housing on a concrete podium slab over a parking garage at the ground level.

 

16th Street Pedestrian Bridge

 

Pedestrian bridge spanning the South Platte River, designed and constructed of materials previously purchased by the City and County of Denver

 

Byron Rogers

 

Tenant finish in Denver high rise building.

 

American Academy II Charter School

 

88,000 sf composite steel and steel joist framed building consisting of 2-story and 3-story classroom wings and 1-story gymnasium and cafeteria areas.

 

South Sloan's Lake/Lake House on 17th

 

12 story for sale residential high rise, totaling 383,000 net square feet residential and 131,000 square feet of parking.

 

Zeppelin Station

 

4-story office building and parking garage

 

Robert Hoag Rawlings Public Library

 

This downtown Pueblo, Colorado project incorporates the reinforced concrete frame structure of the former library into a steel and exposed architectural concrete building.  Structural challenges included a 3-story bridge that spans Bates Lane, cantilevered monumental stairs, and the wafer thin cantilevered 45-ft trellis at the south end of the building.

 

Ford Street Bridge

 

Bridge in downtown Golden, Colorado with two traffice lanes in each direction and pedestrian sidewalks.

 

Grant Park

 

8-story, 135,000 sf condominium project consisting of residential units, ground-floor retail and 2 floors of below-grade parking

 

Coda Cherry Creek

 

282,000 sf, 12-story cast in place post tensioned concrete apartment building with 10 stories of residential above 2 levels of parking above and 2 levels of parking below grade, anticipated LEED.

 

601 Broadway

 

9 story office building totaling 300,000 square feet.

 

Modera River North (28th and Blake)

 

251,389 sf 4-story apartment building with one level of below parking

 

Stapleton Library

 

28,000 sf public library, featuring exposed glulam and steel framing, clerestory pop-up roofs, and custom curved glulam trusses- anticipated LEED Silver.

 

Tower on the Park

 

13-story condominium tower above 2 stories of below-grade parking.

 

Arvada Hilton Garden Inn

 

85,000 sf hotel with four stories of wood framing over a post-tensioned concrete podium and a steel framed amenity and conference space at the lowest level.

 

Source Hotel

 

8 1/2 story hotel totaling 88,500 square feet

 

Parker Library

 

44,000 sf library on two levels with community center spaces.  Features large atrium and complex exterior facade

 

Solera

 

200,000 sf post tensioned concrete apartment complex with 8 stories of residential over 3 stories of parking, LEED BD+C Gold Certified.

 

Centennial School

 

60,000 sf K-12 public school, thermal and lighting efficiency was achieved by utilizing ICF concrete and CMU for the walls and wood and steel for the open roof framing; funded in part by the BEST program.

 

Great Divide Brewery

 

30,000 sf production facility adjacent to a tasting room.

 

Source Garage

 

5 story parking garage totaling 98,000 square feet.

 

Castle Pines Library

 

14,400 sf library

 

The Grove at Stapleton

 

150,000 sf 4 story wood framed senior living complex on ground level post tensioned podium slab with 50,000 sf one story of below ground parking and spread footing foundations.

 

DHA Phase IV

 

105,000 sf, cast in place or post-tensioned concrete apartment complex with 2 and 3 stories of wood framing over concrete framed parking and commercial levels, anticipated LEED TBD. 93 units.

 

1st & Steele

 

12 story apartment totaling 270,000 square feet.

 

Lone Tree Library

 

27,000 sf library; steel framed floors and roofs with a composite concrete deck, custom steel scrim screen, drilled pier foundation

 

Art House Denver

 

10,200 sf 8-story condominium tower with adjacent 2-3 story luxury townhomes.

 

Jeffco Open School

 

91,000 sf steel framed addition and renovation of an existing structure featuring a large two-story clerestory commons/cafeteria, many varying roof heights and clerestory window penetrations in roof steps.

 

Freight

 

28,000 sf, mixed-use building is a remodel of a former freight terminal. It is located in the Taxi development of the Denver Rhino district.

 

Kirkland Museum

 

40,000 sf museum

 

Metro State University of Denver Aerospace Engineering Services Building*

 

4 stories totaling 120,000 sf of classroom, office and laboratory space.

 

Sierra Elementary School

 

47,500 sf, 2-story addition to an existing school

 

Eastbridge Apartments

 

140,000 sf apartment complex located in Stapleton, Denver. The project is comprised of 6 buildings with a total of 118 units.

 

Denver Housing Authority Mariposa III

 

110,000 square feet of wood framed affordable housing, including 81 unites, mixed with retail over a cast-in-place slab over below ground parking.

 

Breckenridge Brewery

 

65,000 sf complex with three buildings including a brewhouse, production and bottling space, and a restaurant.

 

DPS Hampden Heights

 

80,000 sf K-8 school

 

Van Gordon Apartments

 

166,000 sq ft precast concrete parking garage surrounded by a 310,000 sq ft, 267 unit, 5-story multi-unit apartment building. The apartment building is wood framed construction over concrete podiums, grade beams, and drilled piers.

 

DU AOB

 

48,000 sf administrative office building on the University of Denver campus

 

Mississippi Avenue Baptist Church

 

21,000 sf addition to existing building containing new church entry and worship center

 

Iridesent Cloud

 

Stainless steel tension structure spanning 60 feet over a public plaza at the Denver Museum of Nature and Science.  Supported by three hexagonal masts and a mesh of cables.  Each cloud is constructed of an apparently random, three dimensional web of stainless steel rods with several small acrylic prisms attached to the rods. 

 

Morningstar at RidgeGate

 

Structural and miscellaneous steel.

 

Studio Como

 

Commercial renovation of 1957 masonry building in Rino District.

 

American Academy III

 

93,000 sf 3-story PK-8 school

 

601 Broadway

 

9-story office building for Denver Health with 3 stories of above and below grade parking and 6 stories of office space.  Approx. 270,000 sf

 

Calvary Church Addition

 

9,700 sf addition that architecturally and structurally connects the original historic church built in 1867 and the new church built in 1993. 

 

28th & Blake - Modera

 

4 stories of wood framing atop cast in place post-tensioned podium slab, at grade cast in place mild-reinforced structural slab and 1 story below grade parking.

 

South Denver Residence

 

17,000 sf residence of highly refined and contemporary design.

 

Western Ridge Housing at Colorado College*

 

50,000 sf 4 story 3 building dorm complex.

 

Grant House

 

288,000 sf 12-story apartment building, with 1 story of below grade parking

 

Contact

Follow

linkedin_icon.gif