top of page
KL&A Logo.png

Coors Field Parking Structure

372,000 gross sf 3-story precast parking structure to replace a surface lot.

Project Type

Parking Structures

Location

Denver, Colorado

Date

2014

Design Team

Studio Completiva; KL&A Structural Engineering

General Contractor

PCL Construction

Project Cost

$12.4 Million

Steel Contract Value

$1 Million

KL&A Scope

115 tons struct steel, grand stair, canopies.

Services Provided

Structural Engineering; Steel Construction Management; Steel Detailing

Materials

Concrete - Mildly Reinforced; Steel

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page