top of page

MASS TIMBER

1ine Studio Office
Approximately 2,700 square foot new office building with 1 level below grade, a partial mezzanine, and an accessible rooftop deck space. The project will have exposed mass timber at the mezzanine floor, roof, load bearing walls and columns.

Platte Fifteen
219,000 sf 5 story mixed-use office and retail building using Cross Laminated Timber.

University of Denver Burwell Center for Career Achievement
23,000 sf, 4-story building utilizing mass timber panels, glulam beams, and columns on the above grade floors and roof.

Boulder Loading Dock
35,000 sf office building- the first in Boulder and one of the few in the nation to fully integrate CLT into the walls, floors, roof and structure.

Cirrus
Seven story, 140,400 sf multi unit residential building, constructed of wood framing over two stories of concrete podium.

Aspen Art Museum
30,000 sf innovative structural wood trusses support vertical and horizontal glass skin.

Colorado State University Pavilion
A common building designed using 93% of the material from the deconstruction of the Lory Apartments- LEED Platinum.

Collegiate Peaks Bank
7,000 sf, 2 story mass wood office building.

2424 Larimer
106,000 sf in 3 stories, mass timber structural frame above grade with an additional occupied roof deck.

2926 Umatilla
6 story 30,000 sf office building with car elevator.

JD2
6,340 square foot single family residence. Main level is wood framing over crawl space. Upper level is wood and steel framing. Roof is cross-laminated timber supported by wood bearing walls and steel framing. Lateral system is wood shear walls and specially reinforced masonry shear walls.
bottom of page