10th & Acoma
400,000 gsf 15 story building with 6 levels of parking, and 5,000 gsf of ground level retail space.
University of Denver Burwell Center for Career Achievement
30,000 sf, 4-story building utilizing mass timber panels, glulam beams, and columns on the above grade floors and roof.
Platte Fifteen
219,000 sf 5 story mixed-use office and retail building using Cross Laminated Timber.
W Aspen
150,000 sf four story building to replace an existing hotel plus rooftop amenities.
Foundry Hotel
Four story wood framed hotel.
2400 S University
Multi unit residential building.
1401 Lawrence
Cast in place concrete tower with miscellaneous metals package.
Colorado State University Stadium
Construction Services Only. 16,500 lineal feet of handrails and 10.5 tons of miscellaneous metals.
150 South Main Street Station
5 multi-unit residential buildings totaling 347,000 sf.
Sova
288,000 sf 12-story apartment building, with 1 story of below grade parking.
The Lydian
215,000 sf apartments over mixed use retail; 5 levels of Infinity framing system over concrete podium slab and below grade parking.
Coda Cherry Creek
282,000 sf, 12-story cast in place post tensioned concrete apartment building with 10 stories of residential above 2 levels of parking above and 2 levels of parking below grade, anticipated LEED.
Coors Field Parking Structure
372,000 gross sf 3-story precast parking structure to replace a surface lot.
Royal Gorge Bridge & Park
Steel construction for the rebuilt visitor center campus including accessory structures, water/wastewater facilities, zipline and tram platforms, and architectural guardrails throughout.