top of page
KL&A Logo.png
02_platte_15_web.jpg

EMBODIED CARBON
& SUSTAINABILITY

Team Carbon

KL&A's 10 Strategies for reduction

1

2

3

4

5

6

7

8

9

10

Start NOW
Big Rocks First
Innovate
Reuse Buildings & Components
More Biogenic Materials
Less Cement
Long Life, Loose Fit
Cost Matters
Market Evolution & Incentives
Open-Source Effort

Collaboration is a key component to successfully reducing the environmental impact of our designs and construction.

Owners, architects, engineers, contractors, material suppliers, universities, industry organizations  - 

​

LET'S Collaborate

Team Carbon Services

KL&A is the nation's premier provider of Structural Life Cycle Assessment.

We offer Embodied Carbon Impact Reports, Structural Life Cycle Assessment, Embodied Carbon education, material salvage and deconstruction consulting, material stockpile management, concrete mix design consulting and mass timber design. 
For more information or to get us involved in your project reach out to Alexis Feitel at teamcarbon@klaa.com.

KL&A's Comittment to Net Zero

2022 ECAP Cover.png

KL&A was an early signatory to the SE2050 Challenge in 2020. The SE2050 Challenge is a structural engineering industry commitment to reduce embodied carbon in structures and construction to zero by 2050.

​

As part of our commitment, we have contributed Life Cycle Assessments to the SE2050 database and created our Embodied Carbon Action Plan, which can be downloaded below: 

​

2022 Embodied Carbon Action Plan

2021 Embodied Carbon Action Plan

Platte Fifteen Life Cycle Assessment
Case Study

On behalf of Thinkwood and Woodworks, KL&A Engineers and Builders published a Life Cycle Assessment case study which illustrates the embodied carbon benefits of mass timber construction and its relationship to cost and speed of construction.

​

The full case study can be found here.

Platte 15 LCA Paper.jpg

What is embodied carbon?

Emissions-Graph2_edited.png

The building and construction industry contributes 40% of global green house gas emissions.

Bldgs-Pie-Both-01-1030x807.png
Mat-Bldgs-Pie-01-1030x882.png

KL&A'S Sustainability Timeline

2022

living-building-challenge.png

SEEKING LIVING BUILDING CHALLENGE ACCREDITATION

2022

Copy of CSU Pavilion (2).JPG

PRODUCED 50 STRUCTURAL LIFE CYCLE ASSESSMENTS TO DATE

2019

REQUESTED PHOTO.jpg

TALLEST MASS TIMBER OFFICE BUILDING IN COLORADO

OZ Architecture

A&P Construction

2014

3036656-poster-p-1-judge-to-aspen-art-mu

INNOVATIVE STRUCTURAL WOOD TRUSSES

Shigeru Ban Architects

Turner Construction Company

2014

CSU Pavilion.jpg

LEED PLATINUM

1st MASS TIMBER BUILDING IN COLORADO

4240 Architecture

PCL Construction

2021

02_platte_15_web.jpg

MASS TIMBER LIFE CYCLE ASSESSMENT CASE STUDY

Think Wood

WoodWorks

2010

NREL RSF.jpg

LEED PLATINUM, NET ZERO
REPURPOSED OIL & GAS PIPE FOR STRUCTURE

RNL Design/Stantec Architecture, Inc.

Haselden Construction

2022

ILFI_logo_black.png

EARNED INDIVIDUAL LIVING FUTURE ACCREDITATION

2008

LSR Preserve.jpg

LEED PLATINUM

CLB Architects

GE Johnson Construction

2009

16th Street Bridge-2.JPG

Carter & Burgess

New Design Construction

2019

Team Carbon.png

FORMATION OF KL&A'S TEAM CARBON

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

  • LinkedIn
  • Instagram
bottom of page