United States Olympic and Paralympic Museum Bridge

Pedestrian bridge substructure and abutments, including the substructure at the east and west ends of the bridge. The EOR for the bridge is ARUP, KL&A is the EOR for the foundations and supporting structure.

Project Type

Bridges

Date

2021

Location

Colorado Springs, Colorado

Architect

Diller Scofidio + Renfro & Anderson Mason Dale

Contractor

Kiewit

Cost

$13 Million

Project Delivery Type

Design/Bid/Build

Services Provided

Structural Engineering

Materials

Abutment: Concrete - Mildly Reinforced, Concrete - Post Tensioned; Bridge: Steel

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page