top of page
KL&A Logo.png

Aspen Community School

14,000 sf K-8 school and community building with an emphasis of sustainability and energy efficiency. The structure is a combination of premanufactured wood trusses, wood stick framing, and structural steel. The separate gymnasium is 6,500 sf in size that is structured with glulam frame with SIP roof and wall framing.

Project Type

Education K-12

Date

2015

Location

Woody Creek, Colorado

Architect

Cuningham Group Architecture

Contractor

Evans Chaffee Construction Group

Cost

$8 Million

Project Delivery Type

Design/Bid/Build

Services Provided

Structural Engineering

Materials

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page