top of page
KL&A Logo.png

Thompson School District High Plains School

65,000 sf two story school.

Project Type

Education K-12

Date

2017

Location

Loveland, Colorado

Architect

RB+B Architects

Contractor

Heath Construction

Cost

$13.8 Million

Project Delivery Type

Design/Bid/Build

Services Provided

Structural Engineering

Materials

Composite Steel

GOLDEN

1717 Washington Ave

Golden, CO 80401

303.384.9910

LOVELAND

421 East 4th St

Loveland, CO 80537

970.667.2426

CARBONDALE

215 N 12th St, Unit E

Carbondale, CO 81623

970.927.5174

BUFFALO

150 S Main St

Buffalo, WY 82834

307.621.7011

OGDEN

2326 Washington Blvd, 4th Floor

Ogden, UT 84401

385.743.3510

  • LinkedIn
  • Instagram
bottom of page