top of page
SPECIAL
PROJECTS
Wells Denver Precast
28,000 sq ft precast concrete office building and 94,844 sq ft of factory production space consisting of heavy overhead cranes, equipment foundations, precast concrete buildings.
Mountain Forge
Remodel and addition to the Mountain Forge building including a new pool and spa added to an existing roof.
Colorado State University Moby Arena Rails
A loft area created within CSU's Moby Arena to create an area containing two bars with continuous drink rails framing out the space.
3060 Brighton Blvd/VF Labs
6,000 sf steel-framed mezzanine structure with two steel-framed stairs connecting the mezzanine space to level 1.
Garden of the Gods
Restrooms for the Garden of the Gods park.
Ivinson Memorial Hospital Additions
Tenant improvement and equipment support from other structure.
The Gables Skybridge
37 foot enclosed pedestrian bridge between two multi-unit residential structures, one existing and one new, 60 feet above the ground.
Capitol Annex
Grating and rails for two new platforms on a 100 year old existing building.
Equinox Sculpture
Equinox was not just engineered, but also fabricated and erected by KL&A, Inc. In addition, Doug Rutledge of KL&A contributed to the artistic conception of the piece. This sculpture in Loveland, Colorado is built from common structural steel shapes and highlights symbols from the region's past and present.
bottom of page